Main Menu
Home
Commercial
Products & Services
Renovations
Maintenace & Repairs
Past Projects
Latest News
Links
Contact Us
Search
Login Form





Lost Password?
No account yet? Register
Home arrow Past Projects
   
Past Projects Print
New Pools

Renovations & Repairs

  • Charleville 50m Swimming Pool. Central QLD 1999
  • Surfers Paradise State School 25m Swimming Pool. Gold Coast 2002
  • Tallebudgera Outdoor Recreation Centre 25m Swimming Pool. Gold Coast 2002
  • Marybough 50m Swimming Pool. 2002
  • Zillmere State Primary 25m Swimming Pool. North Brisbane QLD 2002
  • St George 50m Swimming Pool. Central QLD 2003
  • Bribie Island Aquatic Park. QLD 2003

Jimboomba State Primary School.  Jimboomba Aug 1999
Ozcrete was contracted by Ron Whitfort to build the Jimboomba State Primary School 25m wet deck pool. Ozcrete’s responsibility was for the construction and finishing of the pool shell, this entailed all excavation, setout, steel fixing, placement of construction joints, concrete spraying & placement, tiling, installation of the plumbing and drainage. This project was started on the 30/8/1999 and finished on the 23/12/1999.


Lavarack Barracks Redevelopment.  Townsville Nov 2000
QBuild contracted Ozcrete to build 6 swimming pools for the redevelopment of the Lavarack Barracks. Ozcrete was the primary builder undertaking all aspects of the construction. This covered all excavation, setout, steel fixing, concrete spraying & placement, tiling, paving, application of the interior finish, supply and installation of the plumbing, filtration and safety fencing. This project was started on the 23/11/2000 and finished on the 13/5/2001 .


Greenbank State School P & C Association.  Greenbank Dec 2001
Ozcrete was contracted by QBuild to build the 8 lane 25m wet deck swimming pool. Ozcrete was again the primary pool builder managing the construction of the pool. This covered surveying and setout of the pool, excavation, underground storm water plumbing, including pit and head wall, formwork, steel fixing, concrete spraying & placement, tiling, paving, supply and fit ladders and lane rope holders, supply and installation of the plumbing, filtration, chemical dosing equipment, landscaping and fencing. This project was started on the 17/10/2001 and finished on the 12/1/2002. 

     
Coorparoo State School.  Coorparoo Brisbane March 2003
Ozcrete sub contracted to Qbuild for the construction of the new 25m wet deck swimming pool. This covered surveying and setout of the pool, site management, removal and stockpiling the top soil from the oval, construction of a gravel road way to carry the trade vehicles and trucks during construction, excavation, underground storm water plumbing, including pit and head wall, formwork, steel fixing, concrete spraying of pool shell, and balance tanks & placement of concrete for all the concrete concourse and surrounding concrete areas, tiling pool water line tiles, wet deck tiles and grates, supply and fit ladders and lane rope holders, construction of concrete starting blocks, supply and installation of the all pipe work to the filter, landscaping, construction of a core filled retainer wall, relocation of existing shade structure and earth bonding. This project was started on the 7/1/2003 and finished on the 9/5/2003.

Indooroopilly State School.  Indooroopilly Brisbane March 2003
Ozcrete sub contracted to Qbuild for the construction of the new 25m wet deck swimming pool. This covered removal of the old pool, surveying and setout of the new pool, site management, excavation, underground storm water plumbing, formwork, steel fixing, concrete spraying of pool shell, and balance tanks & placement of concrete for all the concrete concourse and surrounding concrete areas, tiling pool water line tiles, wet deck tiles and grates, supply and fit ladders and lane rope holders, supply and installation of the all pipe work to the filter and earth bonding. This project was started on the 7/2003 and finished on the 10/2003.


Fitness First Health Club.  Robina Gold Coast March 2005
Ozcrete was the primary contractor for the construction of the 20m heated indoor wet deck lap pool. This covered surveying and setout of the pool in accordance to engineered plans, form work and boxing, setting of all penetrations, concrete spraying of pool shell, and balance tank, supply and installation of all plumbing and filtration systems including pumps and chemical dosing equipment, fully tilling the surface of the pool and wet deck edges and final hand over. This project was started on the 2/1/2005 and finished on the 17/10/2005.

Noosa Aquatic Centre, Noosa September 2006
Ozcrete Pools was the wining contractor for this tender and oversaw the total construction of the new 25m heated pool. Ozcrete’s role included setting up of the site and removal of the original security fence around the existing site and erecting a new temporary fence while the construction was under way. The initial work consisted for construction of an access road through a sensitive environmental area, this was completed with out any complaints or issues from council, the public or other groups. The excavation of the site was straight forward and the final construction was completed as scheduled and in budget with no injuries or recorded incidents.  This project was started on the 23/4/2006 and finished on the 17/9/2006.

Last Updated ( Sunday, 12 November 2006 )