Ozcrete Pools also specialises in water body filtration and reticulation system, design construction maintenance and repairs. Photo of past installations are included below:
Adventure Water Play Park @ Cotton Tree Maroochydore 2010Maroochydore’s Cotton Tree Aquatic Centre underwent a major upgrade during the winter 2010 with the installation of an Adventure Water Play Park. Ozcrete was contracted by Swimfit to construct a new play pool with water toy facility’s. The pool equipment was imported from Waterplay Solution Corp in Canada. We have included photos of the new park and two videos showing the state of the art park in operation. The park was opened the second week of spring school holidays to a crowd of energetic and happy children. We have to admit this was one of our more unusual constructions but it went forward without a hitch and opened with rave reviews.
Waterpark Plumbing & Automated controll systems![]() ![]() Manly Swimming pool November 2009Ozcrete was engaged by Brisbane City Council to undertake the construction of a new 25 x 19m wet edge pool at the Manly Swimming Pool Brisbane. The pool was constructed to FINA specifications and finished in METZ tiles. The project works included plant, building and pool demolition. Earth works, Screw piles, construction of new pools, building structures, finishing's and fittings, supply and instillation of pool water treatment plant, water play toys, lighting, electrical and shade structure. Final site cleaning and landscaping. The project commenced late June 09 and was completed in November 09 without incident. Final surveyed measurements of the lane lengths by Gateway Survey & Planning:
Manly Construction Photos
Tallebudgera Creek Tourist Park May 2009New fully heated free form pool with beach and children's wading pool. The pool supports 2 water slides and an expansive beach area falling in too a water storage tank under concourse thus allowing water catchment in the rainy season. Its retuned too the filters for sanitization and retuned too the main pool. The play pool is furnished with custom designed pool toys commissioned by Ozcrete from the local market. Ozcrete was the primary contractor for the entire project only sub contracting out a number of smaller tasks not handled internally.
Killcoy Aquatic Centre QLD March 2008Killcoy Aquatic Centre project consisted of 3 new pools each with shade structures, pool play equipment, disabled hydraulic lift and access ramps. The project consisted of design and construct of 25 x 13 wet edge lap pool, 16 x 8 cool down wet edge pool both fully finished in with the Metz's tiling system, and a 14 x 6 Leisure pool with extensive pool play equipment. Ozcrete undertook all civil earth works for the site. And supply and installed all water filtration systems.
Russell Island Redland Bay QLD 2007Ozcrete was contracted as the primary contractor to construct two new pools and amenities building for the new Russell Island pool complex. This is a new pools consisted of a 25 x 12 wet edge lap pool with Metz tile band and a 9 x 5 wading pool with pool play toys, as well as all the centres amenities including shade structures, kiosk, and toilets and shower facilities. Construction commenced on Aug 2007 and was completed in Nov 07.
O'Reilly's Rainforest Guesthouse QLD Nov 200725x 6m 1.2 deep recreational pool and spa on bored piers on the edge of the mountain overlooking Mt Warning with infinity edge feature, this required extensive foundations to be built by Ozcrete. The job was completed on budget and on time. Ozcrete supplied and installed the water treatment plan and equipment and finished the pool with glass mosaic tile band.
Clem Jones Sports Centre Carina QLD May 2007Ozcrete was responsible for the design and construction of the new 25 x 19m wet edge swimming pool on screw piles and filtration system. The cost saving with the new design from Ozcrete allow the pool to be fully titled with the Metz tile system.
Noosa Aquatic Centre Noosa QLD September 2006Ozcrete was primary contractor for the construction of the new fully tiled 25 x 18 m heated outdoor FINA compliant pool. Ozcrete was responsible for all associated works: sub excavation, pool construction and Metz tiling, drainage, supply and fitting water treatment plant and equipment, heating systems and final landscaping. This project was started on the 23/4/2006 and finished on the 17/9/2006.
Fitness First Health Club. Robina Gold Coast March 2005Ozcrete was the primary contractor for the construction on piles of the 20m heated indoor wet deck lap pool. This covered surveying and setout of the pool in accordance to engineered plans, form work and boxing, setting of all penetrations, concrete spraying of pool shell, and balance tank, supply and installation of all plumbing and filtration systems including pumps and chemical dosing equipment, Metz Tiling system and wet deck edges and final hand over. This project was started on the 2/1/2005 and finished on the 17/10/2005.
|